ELEVATED GAS PRESSURE SERVICE SYSTEM
THE Problem
- To terminate an existing service in a high-pressure main pipe, the procedure requires the utility to install shut-offs at both ends of the pipe
- Requires service to be temporarily shut off at multiple locations along the main
- Shut-off assets are costly, time consuming to install, and not reusable (must remain in place)
the Solution
- Designed a closed unit that allows for gas to be released while changing tools and maintain a seal on main
- Unit incorporates a drill, camera, and multiple hand tools to tap, clean, and install termination plugs
- Designed for multiple diameter pipes
The Results
- Reduction of service termination time by over 50%
- Shut-off assets not required
- Can be used without excavating a large hole (small hole technology)
- Developed the ability to create urethane seals within 24 hours for any tee configurations